Skip to content
A Lumisol installer on an industrial metal roof

Industrial and warehousing

Large roofs, significant electrical demand and long operating hours can create strong opportunities for on-site generation and storage.

5.0 out of 5 stars, 34 Google reviews (opens in a new tab)

Assess my site

Five quick steps. Charge the battery and the Lumisol team will take it from there.

Ready to charge0%

Step 1 of 5 · Technology

What are you interested in? — select all that apply
Property type
Approximate annual electricity consumption
Do you have a recent electricity bill? (optional)

Black solar panels across an industrial roof

Large roofs, high demand, long operating hours

Warehouses and industrial units often use most of their power during daylight hours, which is when a rooftop array generates.

We plan installation around your operations, so work on the roof and in the plant room does not interrupt the site.

  • Roof condition and loading surveyed first
  • Arrays sized to daytime operating demand
  • Phased installation on live sites
  • Fleet and HGV-yard charging planned in

What we plan for

The issues that shape an industrial or warehouse project.

  • Roof condition

    Loading, condition and remaining roof life checked before design.

  • Operational continuity

    Installation phased so the site keeps running.

  • Fleet electrification

    Charging capacity planned for current and future vehicles.

  • Supply capacity

    Grid connection and DNO application managed for you.

How a warehouse uses energy across a day

Generation peaks around midday. Storage carries it into evening shifts and overnight fleet charging.

12:00
Solar supplying building · battery chargingSurplus generation is being stored rather than exported.
Solar77.2 kWGenerating
Building48.4 kWDemand
Battery45%Charging 28.8 kW
Grid0.0 kWBalanced

Illustrative commercial site · 100 kWp solar · 120 kWh battery

How an industrial project runs

One team from the first conversation to long-term monitoring.

  1. 01

    Understand

    Your site, energy use and objectives.

  2. 02

    Assess

    Roof, structure, supply and grid capacity.

  3. 03

    Design

    System specification and proposal.

  4. 04

    Install

    Phased around your operations.

  5. 05

    Commission

    Testing, certification and handover.

  6. 06

    Support

    Monitoring and maintenance.

Assess my site
Solar panels being installed from roof scaffolding

Accredited for renewable and electrical work

One accredited, insured team responsible for the system from survey to support.

30+ years

Combined director experience across electrical and construction.

MCS

Accredited installer, NAP-65799.

NAPIT

Electrical competency and compliance, NAP-65799.

£5m

Public liability cover, with PI up to £500k.

MCSCertified installer · NAP-65799
NAPIT ElectricalRegistered member · 65799
RECCRenewable Energy Consumer Code
TrustMarkGovernment endorsed quality
TSI Approved CodeTrading Standards Institute
Norfolk Trusted TraderMember
Tesla PowerwallCertified installer

Discuss your site with our commercial team

We’ll review your site and tell you plainly whether it makes commercial sense.